AIR TESTING

FOUR STAGE CLEARANCE

REASSURANCE AIR TESTING

PERSONAL

MONITORING

BACKGROUND

AIR TESTING

LEAK

AIR TESTING

WhatsApp Image 2021-03-01 at 14.45.35.jp
4SC

FOUR STAGE CLEARANCE.

Four stage clearances need to be completed after asbestos has been removed under fully controlled conditions by a licensed contractor.

Stage 1:  The analyst first confirms that the removal contractors have followed all their procedures and have the necessary documents. They also confirm the enclosure has been properly constructed and that transit and waste routes are clear.

Stage 2: The analyst checks inside the enclosure to confirm that all the asbestos that should have been removed is gone and that the area is clean.

Stage 3: Once the analyst has confirmed the area is visually clean they will run air tests inside the enclosure (the amount of air tests depends on the enclosure size). If the air test passes then the analysts gives the go ahead to bring the enclosure down. The previous checks are all to confirm that the area is safe and clean so no one is exposed when the enclosure is removed.

Stage 4: The analyst looks around the area to confirm that all waste has been removed, all of the enclosure has been taken down and that nothing has been left behind from the asbestos removal.

Reassurance

REASSURANCE AIR TESTING.

Reassurance air testing is normally conducted after an incident involving asbestos. For example if a leaky pipe causes a ceiling covered in asbestos textured coating to collapse. A reassurance air test would show whether the area was safe for occupation. They are also ran after non-licensed asbestos removals such as after the removal of asbestos cement or asbestos floor tiles.

These types of air tests are ideal if proof is required that an area is safe and can put residents or workers minds at ease.

Personal
personal-air-sampling.png

PERSONAL MONITORING.

air-monitoring-540x385.jpg
Background
Leak

BACKGROUND AIR TESTING.

Background air testing is often performed prior to working with or removing asbestos to get a baseline level of fibres present in the air. This way an accurate measure of how many fibres were released during work can be made.

Background air tests can also be carried out in places where asbestos items are in-situ but are not going to be removed. For example if there is an asbestos insulating board ceiling a client may request background testing to be performed once a month to confirm that there is no exposure risk.

Personal monitoring involves an individual wearing a small air pump to monitor their exposure to asbestos while completing a specific job. Personal tests are most commonly carried out on asbestos removal contractors as part of their exposure records.

LEAK TESTING.

Leak testing is performed around the outside of an enclosure while asbestos removal works are ongoing inside. It is highly recommended that leak testing is performed whenever licensed asbestos removal work is undertaken.

The leak testing serves to confirm that the enclosure is doing it’s job and that no asbestos fibres are leaking out of unseen gaps. They would usually be ran near the air lock, bag lock and by the NPU.

Leak testing is essential when an enclosure is set up in an occupied building in order to ensure that the residents or workers are not being put at risk by the removal works being carried out.